Model Sistem Dinamik Ketersediaan Singkong Bagi Industri Tape di Kabupaten Jember
(System Dynamic Model of Cassava Supply for Fermented Cassava Industries in Jember Regency)
Model Sistem Dinamik Ketersediaan Singkong Bagi Industri Tape di Kabupaten Jember
(System Dynamic Model of Cassava Supply for Fermented Cassava Industries in Jember Regency)
Bambang Herry Purnomo
Jurusan Teknologi Industri Pertanian, Universitas Jember, Jember, Indonesia
Ahmad Subayri
Jurusan Teknologi Industri Pertanian, Universitas Jember, Jember, Indonesia
Nita Kuswardhani
Jurusan Teknologi Industri Pertanian, Universitas Jember, Jember, Indonesia
DOI:
ABSTRACT
As we know, fermented cassava (TAPE in indonesian language) is one of popular food in Jember Regency. There are a lot of fermented cassava industry at Jember Regency. One of the major problem for fermented cassava industry is decreasing of cassava production. The aim of this research was to design a dynamic system model of cassava availability for fermented cassava industry using dynamic system methods. Model of cassava availability consist of 3 sub models; model of supply, model of consumption and model of industrial demand. Based on simulation results it was known that in 2004-2013 the availability of cassava continues to decrease.The decreasing happenned because tape industry is only able to produce 60% of its maximum capacity. Therefore, it is needed to build scenarios that meet the needs of cassava for tape industries. The result shows four scenarios orientated to the model; 1. Scenario partnership, on this scenario the need of cassava for fermented cassava industry can be met, but make the needed cassava for consumption not fullfilled; 2. partnership scenario and acreage extension plant out as big as 2% per year, this scenario can't meet the need cassava for fermented cassava industry up to next 10 years; 3.The third scenario, partnership scenario and productivity step-up as big as 20 kw/ha is not overdose give influences even have can meet the need cassava next 10 years. The fourth scenario, partnership scenario and combined scenario, combination of scenarios 2 and 3, can supply cassava for the next 10 year.
Keywords: Dynamic System Model, production, availability, scenario
REFERENCES
Daalen, V. and Thissen, W. A. H. 2001. Dynamics Systems Modelling Continuous Models. Faculteit Techniek, Bestuur en Management (TBM), Technische Universiteit Delft.
Eriyatno. 1999. Ilmu Sistem, Meningkatkan Mutu dan Efektifitas Manajemen. IPB Press, Bogor.
[FAO] Food and Agriculture Organization. 1999. Fisheries Management: Technical Guidelines for Responsible Fisheries(68). Rome: 68p.
Forrester, J. W. 1989. The Begining of System Dynamics [paper]. Banquet Talk at the International Meeting of The System Dynamics Society. Stuttgart, Germany ( http://leml.asu.edu/jingle/Wap_Pages/EcoMod_Website/Readings). [Diakses Tanggal 24 September 2015]
Halog, A and Chain, A. 2006. Toward sustainable production in the canadian oil sands industry. Proceding of LCE. Institute of Chemical Process and Environmental Technology. Montreal, Ottawa, Ontario: National Research of Canada: 131–136.
Hidayatno, A., Sutrisno, A., Zagloel, Y. M., Purwanto. 2011. System dynamics sustainability model of palm-oil based biodiesel production chain in Indonesia. International Journal of Engineering & Technology IJET-IJENSI, 11 (3): 1–6.
Marimin. 2005. Teori dan Aplikasi Sistem Pakar dalam Teknologi Manajerial. IPB Press, Bogor
Murillas, A., Chamorro, J. M. 2006. Valuation and management of fishing resources under price uncertainty. Environmental & Resource Economics, 33: 39–71.
Pontecorvo, G., Schrank, W. E. 2001. A small core fishery: A New approach to fisheries management. Marine Policy, 25: 43–48.
Rukmana, R. H. 1997. Singkong, Budidaya dan Pasca Panen. Kanisius, Yogyakarta.
Roberts, C. M., Hawkins, Gelly. 2005. The role of marine reserves in achieving sustainable. Fisheries. Phil. Trans. R. Soc.B, 360: 123–132.
Published
20-12-2015
Issue
Vol. 9 No. 2 2015: Jurnal Agroteknologi
Pages
162-173
License
Copyright (c) 2015 Jurnal Agroteknologi
How to Cite
Purnomo, B.H., Subayri, A., & Kuswardhani, N. (2015). Model sistem dinamik ketersediaan singkong bagi industri tape di Kabupaten Jember. Jurnal Agroteknologi, 9(2), 162-173.